|
2007-2009 Baseline Assessment |
|
The “Baseline Assessment” of Rockymarsh Run is a snapshot or “State of the Watershed” that provides an overview of the watershed as it is and how it can be. The current assessment is a snapshot of the present condition of the watershed over the period of 2007-2009. This baseline data will be used to evaluate long-term changes and trends resulting from changes in land use and restoration activities. The assessment can be downloaded in parts or as a whole as Adobe Acrobat PDF files. Some of the material in the assessment can also be found on other pages on this website.
Document Body (0.5 MB) 
Appendices (5.9 MB) 
Entire Document (6.3 MB) 
|